December 12, 2013
Categories: ISS, MCC, NASA

The docking of American Cygnus cargo vehicle with the ISS may be put off because of ISS thermal control system pump failure, – NASA representative reported from MCC Russia.

Up to the day before the plan was as follows: Cyngnus was to be launched to the ISS on December 19 Moscow time or December 18 American time and to dock with the ISS on December 21 (Moscow time). But as thermal control system pump valve got stuck several systems (they were of no primary importance) were left without power. Due to that the docking may be put off. Naturally there were standby systems to be put into operation, now everything operates nominally but problems with electric power generation can happen and we are assessing now whether Cygnus docking with the ISS on December 21 is possible, – the spokesman reported. He added that the ISS and the crew are out of any danger.

According to him the decision on possible shift of American cargo vehicle docking with the ISS is not taken yet. “We will discuss this issue at the meeting today evening. Probably the decision on Cygnus docking with the ISS will be taken today, – NASA representative noted.

In the future it will be decided whether American astronauts have to perform unscheduled spacewalk to replace the failed pump, – he stated.

In his turn Russian ISS representative reported that there are no problems with Russian ISS segment and the situation with American segment has no impact on Russian cosmonauts’ work.

Image credit – NASA

More from this category:
February 12, 2016

Proton-M booster to launch space devices in the framework of Russian-European ExoMars-2016 research mission was delivered to Baikonur spaceport. “Proton-M booster designated to launch Schiaparelli…

full story
June 16, 2019

On June 16, 1963, the world’s first female cosmonaut made a solo flight into space. This achievement belongs to Valentina Tereshkova – Hero of the…

full story
August 15, 2016

Russian prime and back-up crew members of ISS-49/50 mission passed preflight exams in GCTC. Last week the crews successfully passed exams on Don-Soyuz and Soyuz-MS…

full story
February 16, 2014

Proton-M heavy booster with Turkish TurkSat-4A communication satellite was launched from Baikonur Spaceport, Roscosmos representative reported. Space device separated from Briz-M upper stage at 10.22…

full story
June 23, 2015

Japanese businessman Satoshi Takamatsu who has been passing preflight trainings in Star City is not going to fly to the ISS in September instead Sarah…

full story
September 5, 2013

RIA Novosti – Deputy Prime Minister Dmitry Rogozin confirmed plans on Wednesday to consolidate Russia’s space industry under a single state-controlled corporation within a year….

full story
July 31, 2014

The facilities for Vostochny spaceport have been entirely produced.  There is no schedule delay. That was the subject of discussion during the visit of Roscosmos…

full story
August 13, 2015

Russian space industry specialists unloaded the vehicle and installed it on the special facility of #254 integration building at Baikonur spaceport. Many facilities Progress-M vehicles…

full story