December 19, 2018

Specialists at the “Vostochny” Cosmodrome on the Refueling Station completed the refueling of the “Fregat” upper stage with fuel components.

The upper stage is transported to the spacecraft installation and test facility and installed in the space head unit assembly jig.

Small space vehicles have already been installed on the transition truss, and the “Canopus-B” remote sensing satellites № 5 and 6 are being prepared for installation on the transition truss.

On December 20, a general assembly of the space head is planned, and the next day, its transportation to the launch-rockets assembly and test facility.

The specialists of Roscosmos enterprises in accordance with the schedule started the final preparational operations on the launch vehicle.

The general assembly of the launch vehicle (LV) is scheduled for December 23.

Also on December 23 a meeting of the state commission will be held, which will decide on the readiness of the LV to be transported to the launch complex.

If a positive decision will be made, the transportation of a LV to the launch complex and its installation into the launch system will be held on December 24, 2018.

The launch of the “Soyuz-2.1a” launch vehicle with Russian satellites for remote sensing of the earth and monitoring of emergency situations “Kanopus-B” №% 5 and 6 is scheduled for December 27, 2018.

This will be the fourth launch from the new Russian cosmodrome.

More from this category:
May 17, 2018

Since the beginning of our space era, cosmonauts have formed many wonderful traditions, that provide a connection between times and generations. Among them – a…

full story
September 1, 2014

Soon  ISS-41/42 mission crews will have complex examination trainings, but before that they have to pass so called “standard flight day” training. According to the…

full story
July 11, 2013

Works on liquidation of Proton-M booster crash will be completed by late July, – Kazakhstan Environment Protection vice Minister Bektas Mukhamedjanov reported at the briefing…

full story
March 18, 2019

On March 18, 1965, at 10 am (Moscow time), the “Voskhod-2” spacecraft with a crew (Pavel Belyaev and Alexey Leonov) was launched from the Baikonur…

full story
November 18, 2020

ISS crew patched up the crack in Russian Zvezda module to stop the air leak, – Roscosmos press office reports. Earlier in the course of…

full story
July 2, 2019

Preparations for the launch of the “Progress MS-12” cargo spaceship are continuing at the Baikonur cosmodrome. On July 1, 2019, RSC “Energia” and Yuzhny Space…

full story
February 15, 2018

Progress MS-08 cargo vehicle launched on the second try on February 13 from Baikonur successfully docked with the ISS in automatic mode. Progress MS-08 delivered…

full story
November 26, 2013

Progress M-21M space vehicle carrying cargos for ISS crews successfully separated from Soyuz booster’ third stage, – Mission Control centre representative reported. “Cargo vehicle successfully…

full story