During the preparation of the “Proton-M” launch vehicle with the “DM-03” upper stage and the “Spectrum-RG” space observatory a fault was found.
The State Commission decided to postpone the launch decision to the backup date.
During the preparation of the “Proton-M” launch vehicle with the “DM-03” upper stage and the “Spectrum-RG” space observatory a fault was found.
The State Commission decided to postpone the launch decision to the backup date.
Russian and American scientists started ambitious cosmonauts’ cognitive psychology studies to elaborate new methods and techniques of cosmonaut training for actions under extreme conditions, –…
The training of cosmonauts and astronauts on the actions after landing in a wooded area in winter starts in Star City. According to legend, the…
The final stage of pre-flight training of Soyuz TMA-11M crew that will soon join the team working onboard the International Space Station started at Baikonur…
The first launch of Angara heavy booster will take place no sooner than December 25, Roscosmos representative reported. The spokesman specified that the date of…
At the Baikonur cosmodrome the preparational works for the launch of the “Soyuz MS-14” spacecraft began. The “Soyuz-2.1a” launch vehicle stages were unloaded from the…
The date of Soyuz-2.1b light booster launch will be announced one of these days, the launch is planned for October so far, – Aerospace Defense…
Specialists of the RSC “Energia” (part of Roscosmos State Corporation) at the Baikonur Cosmodrome continue preparations for the launch of the “Soyuz-FG” launch vehicle with…
Pre-launch processing of the Soyuz MS-20 crewed spacecraft for the launch under the Contract with the Space Adventures company to the International Space Station continues…