March 18, 2020
Categories: Russia

This morning, on March 18, 2020, the “Soyuz-2.1b” booster rocket with the Fregat upper stage and a new batch of OneWeb communications satellites were rolled out from the Assembly and Testing building and installed at the launch pad of platform № 31 of the Baikonur Cosmodrome.

After the installation of the rocket in the launcher and verticalization, service masts were reduced to it.

Then, the joint staff of the enterprises of Roscosmos State Corporation began to carry out operations according to the schedule of the first launch day: autonomous tests of the systems and units of the payload, launch vehicle and launch complex are carried out.

The launch is scheduled for March 21, 2020.

The separation of the upper stage from the third stage will take place 562.8 seconds after the start.

Over the next 3.5 hours, in accordance with the flight diagram, the spacecraft will be separated from the upper stage in turn.

OneWeb low-orbit spacecraft are designed to provide high-speed Internet directly via satellite.

In total, the company intends to deploy about 600 satellites in low Earth orbit and begin their commercial use in 2020.

The first six OneWeb satellites were launched from the Guiana Space Center using the “Soyuz-ST-B” launch vehicle on February 28, 2019.

The second batch of 34 satellites was launched on February 7, 2020 from the Baikonur Cosmodrome.

More from this category:
July 13, 2020

20 years ago, on July 12, 2000, the Proton-K launch vehicle launched from the Baikonur Cosmodrome. It launched the Zvezda service module, the third element…

full story
December 6, 2016

Semikatov automatics scientific development and production centre started developing key elements for newest control system for boosters including Soyuz series, – Roscosmos reports. By 2020…

full story
June 3, 2021

The Poisk Mini-Research Module exit hatch is closed now, and Roscosmos cosmonauts Oleg Novitskiy and Pyotr Dubrov have completed the 48th planned spacewalk (VKD-48). During…

full story
May 26, 2014

Today, on May 26, space rocket going to orbit Soyuz TMA-13M spacecraft with ISS-40/41 mission crew onboard on May 28 was installed on #1 launching pad…

full story
July 20, 2020

This Monday Soyuz-2.1 booster with Progress MS-15 was rolled out from the integration building and installed on the launchpad of Baikonur launchsite, – Roscosmos representative…

full story
August 7, 2019

The “Proton-M” heavy-class rocket, launched from the Baikonur Cosmodrome on August 6, 2019 at 00:56 (Moscow time), successfully put into the calculated orbit the spacecraft…

full story
November 11, 2014

At 14.00, Moscow time, GCTC TU-134 aircraft with main Soyuz tMA-15M spacecraft crew comprising crew commnder Anton Shkaplerov ( Roscosmos), first flight engineer Samantha Christoforetti…

full story
November 17, 2019

PJSC”Proton-PM” (part of the integrated structure of NPO “Energomash”) within the framework of existing contracts conducted a final test of the RD-276 liquid-propellant rocket engine…

full story