February 24, 2021

As part of the four GRUS spacecraft (GRUS-1 B, C, D, E) pre-launch processing, the Axelspace’s (Japan) team completed software tests, charged onboard batteries, checked propulsion systems and propellant tanks. As of today, all the four spacecraft are ready for mating with the upper stage.

Since 2015, Axelspace started building up AxelGlobe, the next-generation Earth observation platform, consisting of multiple microsatellites to cover various parts of the world with high frequency. The 4 satellites (GRUS-1B, 1C, 1D, 1E) to be launched this time will be part of the AxelGlobe and this will be the second launch, after the launch of GRUS-1A in December 2018.

High-frequency monitoring will be a reality with the launch of 4 GRUS this time, as AxelGlobe will be operated with 5 satellites, providing up to 1.4-day revisit rate for mid-latitude region, including Japan, and 3-day revisit rate for low-latitude region. This will allow for the full-scale introduction of the imagery data service and the company plans to actively provide solution proposal activities based on the client needs for various industries, including agricultural usage, which requires high revisit rate, and business continuity plan support service, which we have already announced.

More from this category:
January 10, 2014

Preparation works for the first space launches in 2014 started at Baikonur spaceport today. Fuel service units operation centre crew of “Yuzhny” space centre started…

full story
November 27, 2019

At Baikonur the preparation of the “Progress MS-13” cargo ship continues for the launch under the International Space Station program, which is scheduled for December…

full story
July 9, 2014

At 15.58 (19.58, Moscow time) on July 8, 2014 Soyuz-2.1b booster with Fregat upper stage  and seven space devices: Russian Meteor-M meteorological satellite, Russian MKA-FKI research satellite,…

full story
June 6, 2020

Director General of Roscosmos Dmitry Rogozin and the leadership of space agencies of the U.S., Europe, Canada and Japan will discuss the collaboration for future…

full story
July 19, 2021

Preparations complete at the Baikonur Cosmodrome to roll out the Proton-M carrier rocket with the Nauka Multifunctional Laboratory Module. The launch is scheduled from Site…

full story
November 20, 2018

In 2018, it is 20th anniversary of the most significant international space projects, the largest manned artificial satellite of the Earth – the International Space…

full story
April 1, 2020

At Baikonur Cosmodrome the preparation of the “Soyuz MS-16” manned spacecraft continues for launch on April 9, 2020 under the program of the 62nd and…

full story
September 2, 2013

“Multisided space” photo exhibition winners were awarded at MAKS-2013 airshow on Saturday for their contribution to cosmonautics and aviation progress, the organizator of international Airshow…

full story