June 20, 2013
Categories: ISS, Progress

According to ISS flight schedule ATV- cargo vehicle carried out ISS reboost maneuver on June 19, 2013.

According to TSNIIMASH ballistic and navigation support service calculations the OCS engines (orbital control system) of ATV-4 “Albert Einstein” European cargo vehicle were run at 17.05. As telemetry reports the engines operated for 411, 0 seconds.. As a result of this dynamic operation the ISS received velocity increment oft 1,6 m/s .

Average altitude of the station orbit increased by 1,75 km and amounts to 415,75 km.

After station reboost maneuver the ISS parameters are as follows:
– Minimal altitude over the Earth’s surface – 412,2 km
– Maximum altitude over the earth’s surface – 439,4 km
– Orbital period -92, 826 minutes
– Inclination – 51,667 degrees
The maneuver was aimed to test ATV-4 engines and create optimal conditions for ProgressM-20M Russian cargo vehicle docking to ISS. Progress M-20M launch is planned for July27 from Baikonur cosmodrome.

More from this category:
June 30, 2014

Space industry specialists finish preparang  Soyuz-2.1b booster launch with Fregat upper stage, Meteor-M satellite and 6 smaller space devices for the launch . The specialists…

full story
March 9, 2017

On March 09, 1934, Yuri Gagarin the legendary first-man-in-space was born in a small village of Smolensk region. On April 12, 1961, he performed the…

full story
June 16, 2019

On June 16, 1963, the world’s first female cosmonaut made a solo flight into space. This achievement belongs to Valentina Tereshkova – Hero of the…

full story
September 10, 2013

On Monday the act on Russian ISS segment shift handover was signed and the ceremony of delegation of authority took place, – Mission Control Center…

full story
April 12, 2019

Mankind always dreamed of overcoming gravitation. But it was only in the 1961 that this dream was to become reality. On the 12th of April…

full story
March 21, 2014

Soyuz-2.1b booster with Fregat upper stage and GLONASS satellite onboard to be launched at might on March 24 was installed onto the launch pad of…

full story
May 17, 2021

Specialists of RSC Progress (Samara, part of Roscosmos) have finished welding the first stage oxidizer tank (tank ‘O’) for the new Soyuz-5 launch vehicle. The…

full story
April 30, 2015

At 10:09:50, Moscow time, April 28, 2015, Progress M-27M cargo vehicle was launched by Soyuz-2.1a booster from Baikonur spaceport. The launch and the flight were…

full story