June 20, 2013
Categories: ISS, Progress

According to ISS flight schedule ATV- cargo vehicle carried out ISS reboost maneuver on June 19, 2013.

According to TSNIIMASH ballistic and navigation support service calculations the OCS engines (orbital control system) of ATV-4 “Albert Einstein” European cargo vehicle were run at 17.05. As telemetry reports the engines operated for 411, 0 seconds.. As a result of this dynamic operation the ISS received velocity increment oft 1,6 m/s .

Average altitude of the station orbit increased by 1,75 km and amounts to 415,75 km.

After station reboost maneuver the ISS parameters are as follows:
– Minimal altitude over the Earth’s surface – 412,2 km
– Maximum altitude over the earth’s surface – 439,4 km
– Orbital period -92, 826 minutes
– Inclination – 51,667 degrees
The maneuver was aimed to test ATV-4 engines and create optimal conditions for ProgressM-20M Russian cargo vehicle docking to ISS. Progress M-20M launch is planned for July27 from Baikonur cosmodrome.

More from this category:
January 28, 2015

ISS orbit to be decreased by 1,2 km, – Mission Control Centre representative reported. Orbit adjustment maneuver will be accomplished with the help of European…

full story
August 24, 2020

The preliminary date of the first launch of satellites of the Russian low-orbit communication system “Gonets” on the Soyuz-2.1b carrier rocket has been determined, the…

full story
October 16, 2018

On October 15,2018 the State Commission for the investigation of the emergency situation, that occurred on October 11, 2018 during the launch of the “Soyuz-FG”…

full story
January 13, 2014

Progress Design Engineering Bureau of Samara is working on designing Resource-P #2 and Resource-P #3 Earth remote sensing satellites to form on the orbit a…

full story
July 16, 2014

World’s first joint space project uniting different countries started 39 years ago. The ground for Soyuz-Apollo experimental project was laid on 26-27 October, 1970, when…

full story
May 24, 2021

On May 21, 2021 the specialists of Roscosmos subsidiaries – the Vostochny Space Center (a branch of the Center for Operation of Ground-Based Space Infrastructure…

full story
January 11, 2020

Specialists of the Vostochny Space Center together with the RSC “Progress”(parts of the Roscosmos State Corporation) on January 10, 2020, began preparing the components of…

full story
June 16, 2014

Soyuz-2.1b booster with Glonass-M space device was successfully launched from Plesetsk spaceport in Arkhangelsk region on June 14, 2014, – reported representative of  Russian Ministry…

full story