December 16, 2019

Having completed the verticalization, specialists from Roscosmos enterprises performed operations on docking communications of the “package”, assembling temperature control circuits, docking fueling communications and other operations according to the preparation schedule.

A feature of launch preparation in the Guiana Space Center is the separate transportation of three stages of the carrier and the space head part with their assembly on the launch pad using a mobile service tower.

Therefore, later on the “Soyuz-ST-A” rocket was installed the head part with the upper stage and spacecrafts.

The launch of the “Soyuz-ST-A” launch vehicle is scheduled for December 17, 2019 at 11:54 (Moscow time).

 

More from this category:
August 26, 2013

RIA Novosti – A converted Russian intercontinental ballistic missile (ICBM) put South Korea’s Kompsat-5 satellite into orbit on Thursday under the Dnepr satellite-launch program, a…

full story
July 2, 2025

The Soyuz-2.1a launch vehicle, carrying the Progress MS-31 cargo ship, has been transported to the launch pad at the Baikonur Cosmodrome ahead of its launch…

full story
March 26, 2020

At the Baikonur cosmodrome, the final stage of preparation of the main and backup crews of the “Soyuz MS-16” manned spacecraft for flight under the…

full story
August 18, 2019

Specialists of the RSC “Energia” (part of Roscosmos State Corporation) and other leading enterprises in the rocket and space industry performed a set of technological…

full story
December 16, 2014

Russian Rocket and Space Corporation Energia together with two American companies Lockheed Martin and Boeing adjusts the newest American Orion manned spacecraft for the docking…

full story
December 18, 2018

On December 17 at the “Vostochny” cosmodrome a preparation of the spaceunits “Kanopus-B” № 5 and № 6 for launch continues. By now, the electrical…

full story
June 4, 2013

According to RIA Novosti, European specialists may develop navigation and collision avoidance systems for Russian landing probe “Luna-Resource”, – Thomas Reiter ESA manned programs director…

full story
October 17, 2016

The specialists have completed all scheduled works to prepare Soyuz MS-02 spacecraft for the launch and future docking with the ISS, – Mission Control Centre…

full story