November 29, 2016

Soyuz-U booster with new series cargo vehicle Soyuz MS-04 was rolled out from the integration building and erected on pad №1 (Gagarin launchpad).
Specialists of RSC Energia and other Roscosmos enterprises having smth. to do with this launch accomplish final operations on the pad conducting testing of rocket and ground systems, checking interaction between board systems and ground based equipment, analyzing telemetry etc.
The launch according to the ISS flight program is planned for December 1, 2016, 17:51:52, Moscow time.
Earlier it was reported that Progress mS-04 will deliver about 2,5 tons of various cargoes to the ISS including fuel in integrated propulsion system tanks, refilling systems, water and pressurized gas.

More from this category:
December 3, 2018

The “Soyuz MS-11” spacecraft successfully docked to the docking unit of the “Poisk” small research module of the Russian segment of the International Space Station…

full story
March 30, 2020

At Baikonur Cosmodrome the preparation of the “Progress MS-14” cargo ship for launch under the International Space Station program continues. On Friday, March 27, 2020,…

full story
July 29, 2021

On Wednesday, July 28, 2021, specialists of the Nauka Multipurpose Laboratory Module flight control group at the TsNIIMash Mission Control Center (part of Roscosmos) performed…

full story
October 7, 2013

Final preflight trainings of 38/39 ISS crews going to space on November 7, 2013 started in GCTC. For a month before the launch both main…

full story
July 25, 2019

Pre-launch preparation of the “Progress MS-12” cargo spaceship at the Baikonur cosmodrome is at a final stage. Today, on July 25, 2019, the head unit…

full story
June 25, 2014

Angara-1.2PP booster will be rolled-out to the launchpad of Plesetsk spaceport (Arkhangelsk region) today, on June 25.  The decision was taken by State Commission meeting…

full story
June 3, 2021

The Poisk Mini-Research Module exit hatch is closed now, and Roscosmos cosmonauts Oleg Novitskiy and Pyotr Dubrov have completed the 48th planned spacewalk (VKD-48). During…

full story
February 1, 2016

On Saturday Proton-M booster and Briz-M upper stage successfully orbited Eutelsat 9B satellite. The launch was initially scheduled for for January 28, but was shifted…

full story