January 25, 2021
Categories: Roscosmos

At the Baikonur Cosmodrome, Yuzhny Space Center specialists (a branch of the Center for Ground-Based Space Infrastructure Facilities Operation, part of Roscosmos) started fueling the Fregat upper stage intended to inject the Arktika-M spacecraft into low-Earth orbit. Prior to that, a technical management meeting took place, with the Center For Fuelling Complex Tests specialists reporting on the readiness of the necessary equipment.

The joint crew assembly of Yuzhny Space Center, Barmin Research Institute and NPO Lavochkin specialists (all parts of Roscosmos) took place at Site No. 31. The filling of the upper stage with propellants and compressed gases is to be completed on January 24, 2021. The Soyuz-2.1b carrier rocket with the Fregat upper stage and the Arktika-M spacecraft is scheduled to launch in the end of February this year. The rocket is to lift off from the Site No. 31 launchpad at the Baikonur Cosmodrome.

Satellite systems in highly elliptical orbits are necessary for information support in online meteorology, hydrology, agrometeorology, climate and environmental monitoring in the Arctic region. Arktika-M spacecraft will provide round-the-clock all-weather monitoring of the Earth’s surface and the seas of the Arctic Ocean, as well as constant and reliable communication, which will support dynamic socio-economic development of the northern regions of our country.

Taking into account the peculiarities of the operating orbit, Arktika-M spacecraft have increased radiation protection and bigger solar batteries. At the same time, continuous round-the-clock observation of the Arctic region from a Molniya-type highly elliptical orbit requires at least two spacecraft, alternately replacing each other in the working section of the orbit apogee. Therefore, the Arktika-M space system orbital group requires at least two spacecraft.

More from this category:
March 14, 2020

At the Gagarin Cosmonaut Training Center on March 12, 2020, completed the complex examination of the main and backup crews of the ISS-63. The main…

full story
December 12, 2013

American Company Lockheed Martin and British Surrey Satellite Technology Ltd. got the contract for development of Mars landing probe and orbital device that will be…

full story
January 14, 2014

Russian ISS crewmembers – ISS commander Oleg Kotov and flight engineer Sergey Ryazansky will perform spacewalk on January 27 to install medium and high resolution…

full story
January 15, 2016

Proton booster will be launched for European Space Agency needs according to EDRS program from Baikonur spaceport on January 27, 2016, – ESA Head Johann-Dietrich…

full story
January 12, 2015

Japanese entrepreneur Satoshi Takamatsu to be Sarah Brightman’s back-up crew member  will start training in Star City late this month, – American Company Space Adventures …

full story
July 20, 2020

This Monday Soyuz-2.1 booster with Progress MS-15 was rolled out from the integration building and installed on the launchpad of Baikonur launchsite, – Roscosmos representative…

full story
July 20, 2019

Today, on July 20, 2019 at 19:28:21 (Moscow time), a launch vehicle “Soyuz-FG” with a spacecraft “Soyuz MS-13” launched from the site № 1 (Gagarinsky…

full story
February 17, 2022

A new batch of 36 OneWeb spacecraft has been delivered to the Baikonur Cosmodrome as part of Mission 38. The spacecraft arrived at the Krayniy…

full story