September 11, 2020
On Thursday, September 10, 2020, specialists of the Roscosmos State Corporation accomplished ISS orbit adjustment maneuver. For this, the engines of the Progress MS-14 transport cargo vehicle docked to the Zvezda module of the ISS Russian segment were switched on at 23:32, Moscow time. They worked for 225 seconds, as a result, the average altitude of the ISS orbit increased by 0.8 km, the magnitude of the velocity impulse – 0.45 m/s.
According to the data of the ballistic and navigation support service of the Flight Control Center of the Central Scientific Research Institute of Mechanical Engineering (MCC TsNIIMash, part of the State Corporation Roscosmos), the parameters of the space station’s orbit after the correction were:
• Orbital period: 92.90 min;
• orbital inclination: 51.66 degrees;
• minimum height above the Earth’s surface: 419.6 km;
• maximum height above the Earth’s surface: 437.9 km.
This operation was carried out with the aim of forming ballistic conditions before the launch and docking of the Soyuz MS-17 manned transport vehicle, which are scheduled for October 14, 2020. The crew includes Roscosmos cosmonauts Sergei Ryzhikov and Sergei Kud-Sverchkov, as well as NASA astronaut Kathleen Rubins. The backup crew consists of Roscosmos cosmonauts Oleg Novitsky, Pyotr Dubrov, and NASA astronaut Mark Vande Hai.
More from this category:
September 11, 2013

The first after July crash Proton booster launch is planned for the second half of September, but the date is still not set, – Roscosmos…

full story
August 3, 2015

Roscosmos cosmonauts Gennady Padalka and Mikhail Korniyenko will perform a spacewalk scheduled for August. The cosmonauts will polish several windows of Zvezda service module from…

full story
September 5, 2018

Today, the GCTC starts training of the UAE representatives as participants in the space flight on the manned spaceship “Soyuz MS” to the Russian segment…

full story
December 19, 2014

Russian Soyuz-ST booster with Fregat-MT upper stage and four European 03b satellites  to provide internet communication for the distant parts of the world was successfully…

full story
March 12, 2014

Preparation works for the manned launch are under way at Baikonur spaceport. Yuzhny space centre operational crews started preparing equipment and facilities of the launching…

full story
November 25, 2015

Interdepartmental Commission approved main and back-up crews of new ISS mission. The launch of Soyuz TMA-19M is scheduled for December 15 and will take place…

full story
June 18, 2013

Russian ISS crew members Fyodor Yurchikhin and Alexander Misurkin are preparing for extravehicular operations.According to the schedule ISS hatch will be opened on June 24…

full story
August 11, 2020

An echelon with a new module of the Russian segment of the International Space Station was sent on the night of August 11, 2020 from…

full story