June 18, 2014

Preparation for the launch of Soyuz-ST-B with O3b space device  are under way at Soyuz launching pad in Guiana space centre (French Guiana).

At the present time Roscosmos specialists carry out works necessary to prepare Soyuz-ST-B booster for electrical and pressure-and-vacuum tests in the integration building of the spaceport  while Fregat upper stage is being filled with propellant components in S3B technical complex.

According to the launch schedule complex tests of launchpad systems before the roll-out and installation of the rocket are planned for June 19.

The main peculiarity of Guiana space Centre launching complex is in the separate transportation of three booster’s stages (horizontally) and space head (vertically) with further assembling at the launchpad using mobile service tower.

Soyuz-ST booster is a modification of Russian 3 stage Soyuz-2 booster with Fregat-MT upper stage and ST (4,11m diameter) nose fairing adapted to be launched from Guiana Space Centre.

The launch of Soyuz-ST-B with O3b space device is scheduled for July 10.

More from this category:
July 29, 2013

Progress M-20M cargo vehicle successfully docked to the ISS on Sunday delivered to the orbit equipment necessary to repair American EMU (Extravehicular Mobility Unit), spacesuit,…

full story
September 28, 2020

On Sunday, September 27, ISS-64 mission crews both prime and back-up left for Baikonur from Chkalovsky airfield located in Moscow region by two different planes….

full story
May 17, 2018

According to Russian State Corporation “ROSCOSMOS” information,the second Sentinel-3 satellite, Copernicus Sentinel-3B, was launched on 25 April 2018, joining its identical twin Sentinel-3A in orbit….

full story
October 13, 2014

Roscosmos developed deep space and particularly Moon exploration program, – Roscosmos strategic planning office Director Yuri Makarov reported last Friday. “In terms of technologies we…

full story
June 30, 2014

German astronaut Alexander Gerst shaved-off his USA colleagues  Gregory Wiseman and Stephen Swanson working with him onboard the International Space Station. The astronauts made a…

full story
May 18, 2015

ISS orbit was adjusted on May 18,2015. According to ballistic and navigational support service specialists calculations progress M-26M cargo vehicle thrusters were ignited at 03.30,…

full story
May 18, 2018

The launch of the “Soyuz MS” spacecraft on the” Soyuz-2.1a” rocket is scheduled for August 2019. The flight of the ship will pass in unmanned…

full story
July 25, 2019

On July 24, 2019 the specialists of the RSC “Energia” and the Yuzhny Space Center (members of the Roscosmos State Corporation) transported the “Soyuz MS-14”…

full story