March 14, 2016

Proton-M booster with ExoMars-2016 station designated to search for life forms on Mars was launched from Baikonur spaceport today on March 14, 2016.

The main task of 2016 mssion is to search for methane in traces in Mars atmosphere, that could indicate the presence of life forms on the Red Planet in the past or present and well as to test technologies for the next ExoMars mission scheduled for 2018.

Proton was launched nominally, Briz-M upper stage successfully separated from the booster.

Space device will separate from the upper stage is planned for 23.13, Moscow time. Report on the signal receipt is scheduled for March 15, 00.28, Moscow time, – Roscosmos spokesman said.

ExoMars-2016 and ExoMars-2018 is  unique joint project of ESA and Roscosmos. In the course of first mission Trace Gas Orbiter module will study trace gas in Mars atmosphere and ice distribution in Mars soil using equipment developed by RAS Space Research Institute while Schiaparelli landing module is expected to practice the entry and land on Mars surface.

Next mission scheduled for 2018 will deliver to Mars descent module and Mars rover. The scientists from Europe and Russia dealing with this project hope to drill Mars ground to 2 meters and take samples of soil.

More from this category:
April 1, 2020

At Baikonur Cosmodrome the preparation of the “Soyuz MS-16” manned spacecraft continues for launch on April 9, 2020 under the program of the 62nd and…

full story
June 11, 2015

The descent module of Soyuz TMA-15M spacecraft carrying the International Space Station (ISS) Expedition 42/43 crew made a successful landing 148 km to the South…

full story
April 24, 2019

The “Proton-M” launch vehicle, used to launch the “Yamal-601” satellite in the interests of Gazprom Space Systems, today, on April 24, was transported from the…

full story
January 16, 2015

Russian rocket producer Energiya has signed a $1 billion contract with US Orbital Sciences Corporation for the delivery of 60 RD-181 engines, the company’s press service said Friday…

full story
October 17, 2016

The specialists have completed all scheduled works to prepare Soyuz MS-02 spacecraft for the launch and future docking with the ISS, – Mission Control Centre…

full story
July 1, 2019

Today, on July 1, 2019, specialists from Roskosmos enterprises completed the general assembly of the “Soyuz-2.1b” rocket in the Assembly and Testing building of the…

full story
November 25, 2015

New ISS crew period of work onboard the station was increased from 6 to 7 months due to the flight program adjustment, – crew commander…

full story
May 18, 2015

ISS orbit was adjusted on May 18,2015. According to ballistic and navigational support service specialists calculations progress M-26M cargo vehicle thrusters were ignited at 03.30,…

full story