June 10, 2019

At the Vostochny cosmodrome, specialists of Roscosmos enterprises – “TSENKI” and RSC “Progress” (members of Roscosmos State Corporation), in accordance with the preparation schedule, completed the mechanical assembly of the “package” (first and second stages) of the launch vehicle “Soyuz-2.1b.”

The next stage of work is the performing of pneumatic tests of propulsion systems, electrical tests and the final operation – the general assembly of a space rocket.

In accordance with the schedule at the filling and neutralization station, the “Fregat” upper stage is being refueled with fuel components and compressed gases.

In the Assembly and Testing building of spacecrafts, specialists are preparing the spacecraft “Meteor-M” № 2-2.

The launch is scheduled for the beginning of July 2019, the “Soyuz-2.1b” rocket will launch the “Meteor-M” № 2-2 spacecraft into orbit.

This will be the fifth launch from the newest Russian cosmodrome.

5504825169

6368741850

More from this category:
October 21, 2014

ISS-41/42 mission commander Maksim Surayev and flight engineer Alexander Samokutyayev will perform the spacewalk on October 22, 2014 in accordance with the ISS flight schedule….

full story
September 19, 2018

On September 1 7, after the meeting of the Interdepartmental Commission in the Gagarin Cosmonaut Training Center, a pre-flight  press conference of the main and…

full story
June 1, 2015

Pump unit and the construction fixing it to Proton-M booster cruise engine will be modernized in the shortest term, – Khrunichev Centre Director Deputy Alexander…

full story
September 19, 2014

Preparation works for the launch of Proton-M booster with Briz-M upper stage and Luch telecommunication satellite are under way at Baikonur spaceport. Yesterday evening Khrunichev…

full story
January 28, 2016

On January 27, 2016, according to the ISS flight schedule the station’s orbit was adjusted to provide conditions for future 4-orbit scheme docking  with Soyuz…

full story
October 25, 2019

At NPO “Energomash” (part of Roscosmos State Corporation), the commission successfully accepted the next batch of RD-180 liquid rocket engines, manufactured at the enterprise. Representatives…

full story
February 7, 2020

On February 07 at 00.42 (Moscow time) “Soyuz-2.1b” rocketr with OneWeb telecommunication satellites was successfully launched from Baikonur. This launch marked the beginning of the…

full story
June 23, 2019

This week, the “Typical Flying Day” training was performed by the main and backup crews (main crew – Roskosmos cosmonaut Alexander Skvortsov, ESA astronaut Luca…

full story